Project Overview
One Crown Place is a mixed-use development combining 246 private apartments, 140,000 sq ft of office space, and a boutique hotel housed within a restored Georgian terrace.

The scheme blends heritage architecture with modern twin residential towers, creating a distinctive “old-meets-new” landmark in Hackney.

Mace appointed CLM to deliver the passive fire protection package across the commercial, residential and hospitality elements of the development.

Location

Hackney, London

Client

Mace

Building Size

246 Apartments · 140,000 sq ft Offices · Boutique Hotel

Services Delivered

Intumescent Coatings

Firestopping

Compartmentation

Our Scope
 of
Works.

Intumescent Coating Application

CLM applied intumescent coatings to the building’s structural steel frame, achieving the required fire resistance period while delivering a decorative finish for areas where steel remained exposed.

Works included:

  • Coordinating steel protection with the project’s phased construction schedule
  • Ensuring consistent film thickness and high-quality visual finish
  • Integrating application works with simultaneous façade and internal fit-out activities
Firestopping & Compartmentation

CLM provided full compartmentation services throughout the commercial and residential areas, including:

  • Installation of penetration seals for pipework, cable trays and ductwork
  • Firestopping of risers, slab penetrations and service openings
  • Coordinated access planning with other contractors to reach complex or congested zones
  • Delivery of compliant seals aligned with the building’s fire strategy and tested details

Our team worked to a tight programme as external works on the residential towers progressed in parallel.

Coordination & Programme Integration

To maintain progress on a multi-phase site, CLM:

  • Integrated the intumescent paint package into Mace’s construction sequence
  • Coordinated penetration sealing with M&E and façade trades
  • Ensured fire protection works did not disrupt critical path activities

This collaborative approach was essential given the project’s complex interfaces and mixed-use design.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.

Home Group Social Housing
Home Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Home Group’s national housing portfolio. CLM supported FRA-led programmes, completed passive fire protection works, and provided full audit trails through BORIS.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.