Website Cookies

We use cookies to make your experience better. Learn more on how here

Accept
our services

Firestopping and Penetration Sealing

service overview

Firestopping & Penetration Sealing Contractors

Firestopping and penetration sealing are critical to passive fire protection compliance. When pipes, cables, ducts or structural junctions breach fire-rated walls, floors or ceilings, they create direct paths for fire and smoke to spread.

CLM delivers fully-certified firestopping solutions to contain fire, smoke and heat transfer for the required resistance periods. Working across both new-build and remediation projects in all major construction sectors, we adhere to robust installation methods and strict quality assurance processes.

Documentation & Compliance Assurance

Every installation is recorded and verified to provide full traceability and regulatory confidence, with in-depth documentation that supplies clear evidence of compliance for each penetration, supported by digital records and as-built reporting. This information supports building handover, audits and regulatory submissions in line with the Golden Thread.

Our Passive Firestopping
Services

Penetration Sealing Systems

CLM can install a full range of tested solutions to protect openings restoring compartment integrity where services pass through fire-rated walls and floors. We carefully select penetration sealing systems to meet clients’ fire, smoke, acoustic and thermal performance requirements.

Compartmentation Firestopping

Compartmentation systems are integral to maintaining fire resistance across joints, voids and structural boundaries. Our team enhances building compartmentation by installing cavity barriers, linear joint seals and fire-rated mortars at roof voids, wall heads, slab edges and perimeter interfaces.

Project Management & Technical Support

Firestopping delivery is supported through coordinated project management and technical input. Early engagement helps manage trade interfaces, while assistance is provided with specification, product selection and sequencing. Works are delivered in line with construction programmes and safety requirements.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

Design Services

Discuss Your Requirements