The development features exposed ceilings and modern service routes, requiring precise fire protection detailing and a high architectural standard of finish.
Mace appointed CLM to deliver a comprehensive passive fire protection package across the scheme.
50 Finsbury Square, Central London
Mace
~130,000 sq ft
Intumescent Coatings
Penetration Sealing
Cavity Barriers
CLM carried out full fire protection to the building’s structural steelwork. Works began with:
This stage formed part of a £1.3m package commenced in May 2021.
To maintain compartmentation across the refurbished building, CLM installed:
These installations ensured consistent performance across both exposed ceilings and concealed areas.
The building’s exposed ceiling concept required all visible fire protection works to be completed to a high aesthetic standard. CLM delivered: