Project

The Shard

Project Overview
Standing at 310 metres with 72 habitable floors, The Shard is one of London’s most iconic and complex mixed-use towers.

The building combines offices, luxury hotel accommodation, residences and a public viewing gallery, requiring exceptionally robust passive fire protection systems throughout.

Mace appointed CLM to deliver the firestopping package across the tower.

Location

London Bridge, London

Client

Mace

Status

Completed

Building Type

310m Mixed-Use Tower

Services Delivered

Firestopping

Compartmentation

Technical Coordination

Our Scope 
of
Works.

Firestopping of Service Penetrations

CLM carried out extensive firestopping works across walls, floors and risers, ensuring all service penetrations were sealed in line with the building’s fire strategy. This included:

  • Firestopping for cables, pipework, ductwork and trunking
  • Selection of systems based on load-bearing requirements, smoke/gas-tightness and movement needs
  • Installation of tested solutions suited to high-rise and mixed-use environments
  • Restoration of compartment lines across all levels

Each penetration was inspected, assessed and resolved to maintain full fire and smoke separation.

Compartmentation Review

Due to the building’s scale and service density, CLM conducted detailed reviews to:

  • Identify unprotected or non-compliant penetrations
  • Validate compartment walls and floors in critical zones
  • Ensure consistent protection from basement levels to upper floors

This ensured the building met current fire safety regulations and performance expectations.

High-Rise Technical Coordination

The Shard’s height required firestopping solutions that could accommodate structural movement and deflection. CLM:

  • Engaged early with the design team to understand movement allowances
  • Selected appropriate flexible, movement-capable firestopping systems
  • Coordinated installation sequencing with ongoing construction activities

This mitigated risk, avoided rework and ensured long-term system performance.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.