Project

The Hyde Group

Project Overview
The Hyde Group is one of the UK’s leading housing associations, managing more than 50,000 homes across London and the South East.

With a diverse portfolio that includes high-rise residential blocks, estate developments and supported living accommodation, Hyde required a trusted passive fire protection partner capable of delivering compliant, scalable works across multiple occupied properties.

CLM was appointed to deliver a structured programme of fire safety surveys, remediation and compartmentation works across Hyde’s residential portfolio, supporting ongoing regulatory compliance and long-term asset protection.

Location

London & South East

Client

The Hyde Group

Portfolio Size

50,000+ homes

Services Delivered

Fire Door Surveys

Compartmentation Surveys

Remediation

Digital Compliance Recording

Our Scope 
of
Works.

Fire Door & Compartmentation Surveys

Following Fire Risk Assessments (FRAs) and internal compliance reviews, CLM conducted detailed inspections across multiple residential blocks to identify:

  • Fire door deficiencies and non-compliant installations
  • Breaches in compartment walls, floors and ceiling voids
  • Service penetrations affecting fire and smoke separation
  • Damaged or deteriorated fire protection systems

Survey findings were categorised and prioritised to enable efficient remedial planning across the portfolio.

Remedial Fire Protection Works

CLM delivered targeted passive fire protection works across occupied residential environments, including:

  • Repair and replacement of fire doors and associated hardware
  • Installation of compliant penetration seals and cavity barriers
  • Restoration of compartment lines within risers and service zones
  • Rectification of legacy installations that did not meet current standards

All systems were installed in accordance with manufacturer test evidence and relevant fire safety regulations.

Digital Compliance & Reporting (BORIS)

To provide transparency and long-term auditability, CLM deployed its digital reporting platform BORIS across the programme, enabling:

  • A full photographic audit trail of installations
  • Product traceability and system certification records
  • Asset-level documentation for each property
  • Ongoing support for building safety case development

This digital framework supports Hyde’s long-term building safety strategy and regulatory reporting requirements.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

Home Group Social Housing
Home Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Home Group’s national housing portfolio. CLM supported FRA-led programmes, completed passive fire protection works, and provided full audit trails through BORIS.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.