Project Overview
Tottenham Hotspur’s Training Ground in Enfield is a 77-acre elite performance complex used by the first team and academy squads.

The facility includes multiple training, medical, academy and operational buildings designed to replicate match-day environments, including pitches built to the exact specifications of the main stadium.

CLM was instructed to deliver a programme of firestopping remedial works across the Training Ground Building, Ladies’ Building and Grounds Maintenance Building. Works were delivered while the facility remained live and operational, requiring careful coordination to minimise disruption to daily football activities.

Location

Enfield, North London

Client

Tottenham Hotspur Football Club

Facility Size

77 acres

Services Delivered

Firestopping Remediation

Passive Fire Protection

Our Scope 
of
Works.

Firestopping Remediation

CLM provided a full suite of compliant passive fire protection measures to restore compartment integrity across multiple buildings.

Works began with:

  • Sealing service penetrations in walls, floors and risers
  • Treating ductwork, pipework and trunking breaches
  • Upgrading existing firestopping to meet current standards
  • Protecting steel elements requiring additional fire resistance

Approved systems installed included:

  • Nullifire FB750 Intubatt Coated Batt
  • Nullifire FI025 Intuflex Insulation Wrap
  • Nullifire FP170 Intumescent Pipe Collar
  • Nullifire FS709 HP Intumescent Sealant
  • Nullifire FS702 Acrylic Sealant
  • Nullifire FP333 Trunking Infill
  • Nullifire FC101 Intumescent Coating

These systems were selected to deliver proven performance across a broad range of penetration types and structural conditions.

Life Safety & Operational Requirements

With multiple buildings accommodating players, staff and visitors, the Training Ground required dependable compartmentation to support safe evacuation in an emergency.

CLM’s works ensured:

  • Means of escape remained protected
  • Fire and smoke spread was prevented between high-activity zones
  • Compartment lines were restored to align with the fire strategy
  • Critical pathways and circulation routes remained fully compliant

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.

Home Group Social Housing
Home Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Home Group’s national housing portfolio. CLM supported FRA-led programmes, completed passive fire protection works, and provided full audit trails through BORIS.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.