Website Cookies

We use cookies to make your experience better. Learn more on how here

Accept
our services

Slab Edge, Acoustic Sealing & Cavity Barriers

service overview

Slab Edge, Cavity Barriers and Acoustic Seals

Cavity barriers, slab edge systems and acoustic seals are all essential to compartmentation, preventing the movement of fire, smoke and heat through concealed voids, perimeter gaps, structural joints and wall or floor interfaces. To help achieve this, CLM delivers fully-certified passive fire protection systems to maintain compartment integrity across complex building structures. These systems ensure that all concealed voids, junctions and interfaces in a building meet the latest fire safety regulations and work in harmony as part of a wider fire protection strategy.

Key Features of Slab Edge,
Cavity Barrier &
Acoustic Seal Installation

Maintaining Continuous Compartment Lines

CLM design and install systems that protect all gaps and voids where fire and smoke can travel, enhancing the fire resistance of slab edges, wall heads, roof voids and façade junctions. These systems are available for both new-build and remediation projects, reinforcing fire resistance, smoke control and acoustic performance where required.

Accredited Installation & Inspection

Installations are delivered in accordance with British Standards and manufacturer guidance by experienced teams. Cavity barrier placement is aligned with the building fire strategy, using load-bearing and non-load-bearing systems across wall and floor assemblies. Detailed inspections are undertaken to identify legacy issues or breaches introduced by third-party works.

Integrated Acoustic Performance

Where acoustic requirements apply, we can provide systems that combine fire resistance with improved sound reduction and environmental sealing (addressing moisture resistance and air-tightness). Our acoustic sealing solutions are suitable for residential, commercial and mixed-use assets, and are also compatible with a wide range of façade, wall and floor types.

Our Compartmentation
and Cavity
Barrier Services

Slab Edge Protection

We install slab edge systems to provide critical perimeter fire sealing at the interface between floor slabs and façade systems. These systems are designed to maintain compartmentation at curtain walling and façade junctions, while accommodating structural movement and construction tolerances. This limits heat transfer and prevents smoke from spreading throughout a building either horizontally or vertically, with integrated thermal and acoustic solutions available where required.

Cavity Barrier Installation, Inspections & Remediation

CLM specialise in fully-compliant cavity barrier installation and maintenance, forming continuous fire-resisting lines and restricting smoke spread within concealed voids such as wall cavities, floor voids and roof junctions. Depending on specification, cavity barriers can provide between 15 and 120 minutes of fire resistance and are selected in line with Approved Document B and BS 9991 requirements, using intumescent, mineral fibre or rigid systems as appropriate.

We also survey existing cavity barrier and void protection systems, which risk falling into disrepair in older buildings or compromising fire safety due to incomplete works. Our team will remove and replace non-compliant elements where required, documenting findings through clear reporting aligned with Golden Thread principles. This is then supported by as-built records that confirm system locations, specifications and compliance evidence.

Acoustic Sealing Systems

We can install acoustic sealing systems to improve sound separation across building elements while maintaining fire performance. These systems consist of barriers and isolation materials that are designed to integrate with firestopping measures, enhancing air-tightness and reducing sound transmission for dual fire and acoustic performance.

Compartmentation Surveys

CLM conducts detailed assessments of fire and smoke control measures throughout a building, identifying weaknesses that may compromise compartment lines within walls, floors, voids, joints and structural interfaces. In particular, our team will scrutinise any breaches caused by Mechanical and Electrical (M&E) installations, building refurbishments or legacy defects. Our compartmentation surveys culminate in prioritised recommendations for remedial works, which our team of specialists will install with minimal disruption to occupants or building operations.

Project Management & Technical Support

We offer specialist support to help clients with planning, sequencing and integration of cavity barriers and slab edge systems. With coordinated delivery across multiple trades, we have the expertise and capability to review fire strategies, drawings and O&M documentation, assist with product selection and compatibility checks, and liaise with façade, M&E, drylining and structural trades. All of our works are programmed to seamlessly align with project timelines while maintaining compliance and safety requirements.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

Frequently Asked Questions

01

What remedial actions are the highest priority in terms of risk?

Any instance of non-compliance poses a fire risk, but breaches around escape corridors are a particularly high priority as they could hinder safe evacuation. Another priority is where there is no evidence of firestopping in a compartment at all.

02

How does CLM Fireproofing work with clients to implement remedial actions?

CLM first provides a scope of work outlining required actions, then schedules the work around the day-to-day operations of a live building. Costs are agreed, and programming is finalised alongside any health and safety considerations.

03

What are the risks of unsealed cavities?

Unsealed cavities — such as gaps between walls, floors and ceiling voids — can cause ‘air buoyancy’ that accelerates the passage of smoke and fire between areas of a building. In tall buildings, this can allow fire to travel vertically without resistance.

04

What is the difference between a cavity barrier and a firestop?

A cavity barrier is a fire-resistant material placed in enclosed spaces within buildings to prevent the passage of flames and smoke. Firestops serve a similar purpose but are typically used to seal gaps around services (e.g., pipes, conduits) and imperfections between fire-resisting elements.

05

How should cavity barriers be installed?

Cavity barriers should be placed near the edges of internal cavities, such as around window/door openings or extract vents, and at junctions where a wall cavity aligns with a compartment wall or floor. Installation also requires consideration of building movement and deformation to maintain effectiveness.

Design Services

Discuss Your Requirements