The Peninsula London

Project Overview
The Peninsula London is a landmark luxury hotel development located in Belgravia, overlooking Hyde Park Corner and Wellington Arch.

The scheme will comprise 190 guest rooms and suites, 25 private residences, a selection of bars and fine-dining restaurants, a grand ballroom, spa and wellness facilities, and a 1,100 sq m retail arcade.

Appointed by Sir Robert McAlpine, CLM was responsible for delivering passive fire protection across the new hotel and residential elements.

Location

Belgravia, London

Client

Sir Robert McAlpine

Building Type

Luxury Hotel & Residences

Services Delivered

Firestopping

Compartmentation

Our Scope
 of
Works.

Firestopping Installation

CLM implemented comprehensive firestopping systems throughout the building, ensuring all compartment lines were fully protected. Works included:

  • Sealing service penetrations within walls, floors and ceiling voids
  • Firestopping to protect joints, rafters, ducts, pipes and cable routes
  • Installation of tested solutions suitable for high-occupancy, high-value environments
  • Ensuring correct integration with architectural and interior design features

Given the building’s scale, mixed uses and premium specification, maintaining clear, compliant compartmentation was central to the project.

Compartmentation Review & Risk Management

CLM conducted detailed assessments across structural and service interfaces to:

  • Identify gaps, openings or unprotected routes that could allow smoke or fire spread
  • Address legacy construction details and rapidly resolve identified risks
  • Provide solutions aligned with the hotel’s fire strategy and luxury fit-out requirements

Our teams worked closely with other trades to maintain programme continuity within tightly controlled interior spaces.

Programme & Delivery

Works commenced in January 2021 and continued in line with the wider construction programme. Due to the high-profile nature of the project, CLM adopted a coordinated and phased approach to ensure:

  • Minimal disruption to finishing trades
  • Consistency in installation quality across guest rooms, residences and amenity spaces
  • Compliance with hospitality sector fire safety standards

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.