40 Leadenhall Street

40 Leadenhall Street is a 900,000 sq ft commercial tower and one of the largest developments ever approved in the City of London.

Rising 34 storeys, the scheme will deliver a mix of Grade A office space, retail units, restaurants, and fitness and wellness facilities. Its scale, complexity and high-density service routes demand robust and coordinated passive fire protection throughout.

Mace appointed CLM to provide the firestopping and compartmentation package across the tower and basement levels.

Location

City of London

Client

Mace

Building Size

900,000 sq ft

Services Delivered

Firestopping

Compartmentation

Our Scope
 of
Works.

Firestopping Installation

CLM is delivering comprehensive firestopping across all levels of the building, ensuring that service penetrations created by mechanical, electrical and plumbing trades are fully sealed.

Works included:

  • Installation of tested systems for pipes, cables and ductwork
  • Sealing risers, floor penetrations and wall openings
  • Protection of key compartment lines to prevent fire and smoke spread
  • Coordination with multiple trades working simultaneously across the tower

These installations support the building’s fire strategy and ensure continuous, compliant compartmentation throughout.

Compartmentation & Technical Coordination

Given the project’s scale and number of interfaces, CLM works closely with Mace, consultants and specialist trades to:

  • Identify and resolve non-compliant penetrations
  • Select best-tested and manufacturer-approved solution
  • Sequence firestopping works in line with the construction programme
  • Maintain quality control across rapidly changing site conditions

This collaborative approach ensures consistent performance across the tower’s high-density service routes.

Ongoing Delivery

Works began in July 2021 and represent a significant fire protection package exceeding £3.5m. CLM continues to deliver staged compartmentation and firestopping installations as the tower progresses toward completion.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.

Home Group Social Housing
Home Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Home Group’s national housing portfolio. CLM supported FRA-led programmes, completed passive fire protection works, and provided full audit trails through BORIS.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.