Project

Home Group

Project Overview
Home Group is one of the UK’s largest housing associations and social enterprises, managing 55,000 properties and supporting 113,000 customers across England and Scotland.

With a diverse mix of residential buildings and supported living environments, the organisation required a strategic fire protection partner capable of delivering consistent, compliant works across a large and varied property portfolio.

CLM was appointed to provide ongoing passive fire protection support, including surveys, remediation and digital compliance management.

Location

England & Scotland (National Portfolio)

Client

Home Group

Property Count

55,000+

Services Delivered

Surveys

Remediation

Fire Doors

Compartmentation

Digital Compliance

Our Scope
 of
Works.

Fire Door & Compartmentation Surveys

Following independently conducted Fire Risk Assessments (FRAs), CLM carried out detailed surveys across multiple properties to identify:

  • Fire door defects and non-compliant installations
  • Breaches in compartment walls, floors and service risers
  • Issues arising from historical works or uncontrolled service penetrations
  • Gaps, damaged seals and compromised structural elements

These surveys formed the basis for prioritised remedial programmes.

Remediation & Passive Fire Protection Works

CLM delivered a wide range of compliant fire protection works across occupied and unoccupied properties, including:

  • Repair and replacement of fire doors and components
  • Installation of penetration seals and cavity barriers
  • Restoration of compromised compartment lines
  • Remediation of non-compliant legacy works

All works adhered to the relevant standards and manufacturer test data.

Technical Support & Client Guidance

Beyond surveys and installations, CLM supported Home Group with:

  • Technical clarification and best-practice advice
  • Project and programme management across multiple properties
  • Knowledge-sharing through CPD and client training sessions
  • Ongoing support in interpreting FRA findings and regulatory requirements

This ensured a consistent, informed approach to fire safety across the organisation.

Digital Compliance & Recording (BORIS)

CLM deployed its digital reporting platform BORIS to provide Home Group with:

  • A complete audit trail of installations
  • Photo evidence and material traceability
  • As-built documentation for each asset
  • A live record that supports future inspections and regulatory compliance

This platform ensures long-term transparency and lifecycle management across all completed works.

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

Oak Cancer Centre Healthcare
Oak Cancer Centre

Firestopping, cavity barriers and Promat structural protection for a new healthcare and research facility in Sutton. CLM installed certified systems from FSi, Protecta, Firefly and Promat to deliver full passive fire protection across clinical, research and outpatient areas.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.