Oak Cancer Centre

Project Overview
The Oak Cancer Centre is a major new healthcare facility funded by The Royal Marsden Cancer Charity.

Located in Sutton, the building brings together outpatient services, medical day-care facilities and collaborative workspaces for more than 400 clinical researchers. The development forms a key part of The Royal Marsden’s ongoing expansion and is designed to support world-leading cancer diagnosis, treatment and research.

ISG appointed CLM to deliver a comprehensive passive fire protection package across the new centre.

Location

Sutton, Surrey

Client

ISG

Building Type

Healthcare / Research Facility

Services Delivered

Firestopping

Cavity Barriers

Structural Protection

Our Scope 
of
Works.

Firestopping Installation

CLM installed a range of tested firestopping systems to protect compartment lines across walls, floors and ceiling voids.

Works included:

  • Installation of batt and mastic systems using FSi and Protecta products
  • Sealing penetrations for pipework, cabling and mechanical services
  • Ensuring all interfaces were fully compliant with the fire strategy

These systems were selected to deliver proven performance across a diverse range of service penetrations typical in healthcare environments.

Cavity Barriers

To protect concealed voids above ceilings and within service zones, CLM installed:

  • Firefly Apollo Lite cavity barrier systems
  • Collaroll for protection around penetrations, including pipes, cable trays and trunking

This ensured effective smoke and fire control throughout interconnected and sensitive clinical areas.

Structural Protection

CLM also delivered fire protection for structural steel by:

  • Boarding steel elements using Promat systems
  • Providing consistent and durable fire resistance across the structural frame
  • Coordinating installation with M&E and ceiling works to maintain programme flow

Case Studies

1 Exchange Square Commercial Construction
1 Exchange Square

Intumescent coatings, firestopping and BIM consultancy for a 447,000 sq ft Grade A redevelopment at Broadgate. CLM delivered surface preparation, priming, intumescent protection and topcoating across steelwork, supported by digital clash detection and compliant detail selection. Targeting BREEAM Outstanding and NABERS 5*.

Tottenham Hotspur Training Ground Hotels and Leisure
Tottenham Hotspur Training Ground

Firestopping remediation across multiple buildings at the club’s 77-acre performance complex. Works included sealing penetrations, upgrading existing systems and protecting steelwork to restore full compliance with the site’s fire strategy.

Peterborough Court Commercial Construction
Peterborough Court

Cementitious coatings, cavity barriers and firestopping for a 292,000 sq ft Grade A redevelopment at 133 Fleet Street. CLM delivered Monokote MK6-HY application, PROMAT repairs and compartmentation works with integrated pre-construction and product selection support.

50 Finsbury Square Commercial Construction
50 Finsbury Square

Intumescent coatings, penetration sealing and cavity barriers for a 130,000 sq ft refurbishment near Moorgate. CLM delivered blast preparation, exposed-finish fire protection and bespoke detailing to suit complex services and architectural requirements.

40 Leadenhall Street Commercial Construction
40 Leadenhall Street

Firestopping and compartmentation for a 900,000 sq ft, 34-storey mixed-use tower in the City of London. CLM is delivering tested firestopping systems across tower and basement levels, coordinating closely with trades to maintain compliant compartmentation on a complex, high-density project.

One Crown Place Commercial Construction
One Crown Place

Intumescent coatings and full compartmentation for a major mixed-use development in Hackney. CLM delivered steel protection, penetration sealing and coordinated access across residential towers, offices and a boutique hotel conversion.

The Hyde Group Social Housing
The Hyde Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Hyde’s residential portfolio in London and the South East.

Home Group Social Housing
Home Group

Fire door and compartmentation surveys, remediation and digital compliance recording delivered across Home Group’s national housing portfolio. CLM supported FRA-led programmes, completed passive fire protection works, and provided full audit trails through BORIS.

Springfield University Hospital Healthcare
Springfield University Hospital

Firestopping, fire curtains and compartmentation reviews for new mental health facilities at Springfield Village. CLM sealed service penetrations, resolved complex risks and ensured full compliance across inpatient and clinical environments.

The Peninsula London Hotels and Leisure
The Peninsula London

Firestopping and compartmentation for a landmark luxury hotel in Belgravia. CLM installed tested systems across guest rooms, residences and amenity spaces, ensuring compliant separation throughout the high-specification development.

The Shard Hotels and Leisure
The Shard

Firestopping and compartmentation works across London’s 310m mixed-use landmark. CLM inspected and sealed service penetrations, resolved complex interface issues and coordinated with designers to meet high-rise movement and compliance requirements.

Chapter Living Residential Construction
Chapter Living

Firestopping and compartmentation for a 39-storey, 905-room student accommodation tower. CLM is delivering high-rise compliant installations aligned with the Building Safety Act and associated regulations.